Guide for device owners · Outsourcing production

Contract manufacturing agreement: the clauses to agree before you outsource device production

A contract manufacturing agreement sets out who owns the design, what the factory builds and tests, how quality is accepted, how changes, components and prices are handled, and how the relationship ends. For electronic devices such as network equipment, most disputes start in five places: acceptance testing, ownership of the design and firmware, tooling and test fixtures, component supply, and exit. This page lists the clauses to cover. It is a checklist, not a legal template: have your lawyer draft and review the final agreement.

The documents in a manufacturing relationship

A contract manufacturing agreement rarely stands alone. Each document below does a different job, and keeping them separate makes each easier to update.

Documents commonly used when outsourcing production
DocumentWhat it settlesWhen it is signed
Non-disclosure agreementWhat each side may do with the other's confidential informationBefore design files and specifications are shared
Contract manufacturing agreementScope, ownership, pricing mechanics, supply, liability, term and exitBefore the first production order
Quality or technical agreementSpecification, test plan, acceptance criteria, first-article approval, change controlWith the main agreement, updated as the product changes
Forecasts and purchase ordersQuantities, delivery dates and prices for each orderDuring production

An "OEM agreement" is often the same thing under another name: the factory builds a product that the owner sells under its own brand.

Clause checklist for a device contract manufacturing agreement

Clauses and the questions each should answer
ClauseWhat it should settleQuestions to ask
Parties and scopeWhich products, which stages of manufacture, which sitesIs the scope final assembly only, or board assembly too? Can work move to another site?
Specifications and documentsWhich version of the specification, drawings and bill of materials governsWhat happens when documents conflict?
Ownership of design, firmware and IPWho owns the design, the firmware and any improvements made during productionDoes anything developed on the line belong to the factory?
ConfidentialityUse and protection of design files, firmware and test dataDoes it survive the end of the agreement?
Tooling, fixtures and test equipmentWho pays for them, who owns them, where they are kept, who maintains themCan you take them to another factory?
Components and approved alternatesWho buys components, which alternates are approved, who carries the risk of shortagesWho decides on a substitute when a part is short?
Forecasts, orders and capacityHow forecasts become firm orders, and how much capacity is reservedWhat happens if you order above or below forecast?
Buffer stockWhether stock of components or finished units is held, and who pays for itWho owns excess stock if the programme slows?
Testing and acceptanceWhich tests run on every unit and which on a sample, the acceptance criteria, first-article approvalWho signs off the first build, and against which document?
Certification and type approvalWho holds approvals for the finished device in each marketDoes a change of build site or component trigger re-qualification?
Change controlHow design, component or firmware changes are proposed, approved, priced and re-validatedCan either side make a change without written approval?
Pricing and price reviewPrice basis, currency, and how component cost changes are passed onHow often can prices be reviewed, and on what evidence?
Delivery, packaging and labellingDelivery terms, packaging and labels, and when risk passesWho meets the labelling rules of the target market?
Defects, warranty and field supportHow defects are reported, analysed and remedied, and for how longWhat counts as a manufacturing defect, as opposed to a design defect?
Liability and insuranceLimits of liability and the insurance each side holdsAre some losses excluded?
Local content recordsWhich data each side provides when a buyer or authority asks about local contentWho prepares and keeps the records?
Term, termination and exitNotice periods, and what happens to tooling, fixtures, stock and open ordersCan you place a last order before the agreement ends?
Governing law and disputesWhich law applies and how disputes are resolvedIs there a step for escalation or mediation before formal proceedings?

Clauses that matter more for network devices

  • Firmware version control. Name the firmware build that is loaded on each production lot, who supplies it, and who approves a new version before it reaches the line.
  • Per-unit tests. For ONT devices, decide what is tested optically on every unit; for 5G CPE, which RF tests run on every unit rather than on a sample. Write the split into the test plan.
  • Type approval for the locally built model. Agree who holds the approval and what re-qualification is needed when the build site or a component changes. Settle it before volumes are committed.
  • Kits and labelling. For devices sold as kits, such as Mesh Wi-Fi nodes, define what is in each box and how units are labelled and paired.
  • Local content records. If your buyers ask about local content, agree which records the factory keeps. Local content is assessed by the authority for a specific product, not declared by either party.

Gaps to check before signing

  • The test plan is "to be agreed" with no date or owner.
  • Fixtures are paid for by you but not named as yours.
  • There is no clause on what happens to stock and fixtures at exit.
  • Component substitutions are allowed "as needed" without your approval.
  • Price review has no stated trigger or evidence.
  • The agreement is silent on who holds type approval for the locally built model.

Questions about contract manufacturing agreements

Is there a template I can download?

This page is a clause checklist, not a template. Agreements differ by product, volume and jurisdiction, so use the checklist to brief your lawyer, who can draft the agreement for your situation.

What is the difference between an OEM agreement and a contract manufacturing agreement?

Usually only the name. Both cover a factory building a product to the owner's design for the owner to sell under its brand. An ODM arrangement is different: the factory's own design becomes the product.

Who should own the test fixtures?

Whoever the agreement says. If you pay for fixtures and want the option to move production, the agreement should name them as yours and say how they are returned.

Should the quality agreement be a separate document?

It is common, because the test plan and acceptance criteria change more often than the commercial terms.

Which law governs the agreement?

The parties choose it in the agreement. Take legal advice in the jurisdiction where the agreement will be enforced.

Planning to outsource production of a network device?

IK Semiconductor (Interkey Semiconductor) assembles network devices in Riyadh under OEM contracts: ONT, 5G CPE and Mesh Wi-Fi, with a 5G MiFi line planned. The work today is at the SKD stage, and board-level assembly (CKD) is planned for 2028. If you are preparing to outsource assembly, we can go through these points for your device. Terms are agreed for each programme.

info@interkey-sc.com.sa · +966-11-2180999 · +966-55-3475469 · Riyadh, Saudi Arabia